Step Flashing At Roof Height

Pin On Roofing

Pin On Roofing

Pin On Water Proofing

Pin On Water Proofing

Pin On Roof Tie In

Pin On Roof Tie In

Pin On Chimney Flashing

Pin On Chimney Flashing

Pin On Construction

Pin On Construction

How To Build A Porch Screen Porch Construction Building A Porch House With Porch Screened In Porch

How To Build A Porch Screen Porch Construction Building A Porch House With Porch Screened In Porch

How To Build A Porch Screen Porch Construction Building A Porch House With Porch Screened In Porch

Posted march 4 2017 filed under roof installation roof repair maintenance.

Step flashing at roof height.

If this is a repair job the siding must also be removed and replaced with the flashing. This height has become the industry standard and is recognized by most membrane manufacturers. The flashing material should be 4 inches by 7 inches in length when it lies on the roof deck. Manufacturers requirements can vary anywhere from 2 inches to 10 inches and you probably won t be able to see the sidewall flashing completely anyway.

Vertical flashings must be a minimum of 8 inches above the completed roof surface. Even if one piece of step flashing fails the flashing and shingle below it start the process over again. Step flashing if made of metal should be galvanized steel at least 0 019 inches thick irc 2015. This flashing is typically field fabricated from a sheet of 26 ga.

Next l shaped pieces of metal typically aluminum are placed under each shingle that butts up against the vertical wall. Step flashing should be integrated with the drainage plane above for example overlap housewrap over it. Roof felt should be installed prior to installing the step and kick out flashing. Step flashing needs to turn up a minimum of three inches up the sidewall.

Galvanized sheet metal bent at a 90 degree angle i e. Second step flashing needs to extend 8 to 14 inches above the shingles according to the national roofing contractors association nrca. The 8 inch height prevents water from pouring over the top of the flashings into the building or system. This layer is called the step flashing.

Step flashing is used where a roof meets a wall to cover the junction of those elements preventing leaks. Step flashing is used to provide a water tight connection where roofing adjoins a vertical juncture. One side of the l shape lays under the shingle and the other side attaches to the side of the wall. Flashing is a strip of metal usually aluminum about 8 inches long and bent at 90.

Continuous flashing against a sidewall is one way to install a roof but it s not the correct way. Step flashing step flashing redirects the water back onto the shingle. The 7 inch length ensures a 2 inch headlap on each course. The vertical side will be hidden behind the exterior wall covering material.

Once complete the housewrap should overlap the step flashing that s applied to the wall. Step flashing should be extended at least 4 inches up the wall from the roof deck and at least 4 inches out along the roof deck 2015 international residential code irc. First step flashing must be installed before the siding so that the siding can cover the top of the flashing. Bent into an l shape.

Pin By Nguyễn Hữu Hung On Loft Conversion Roofing Roof Design Roof Edge

Pin By Nguyễn Hữu Hung On Loft Conversion Roofing Roof Design Roof Edge

Pin On Roof Flashing

Pin On Roof Flashing

Pin On Building

Pin On Building

Pin On Roof Flashing

Pin On Roof Flashing

Source : pinterest.com